Skip to content

Fresh Water Line Optimization in an Oil Field in Argentina

Greater operational efficiency with fewer joints and fast implementation.

Estudo de Caso Nº

193

Cliente

Phoenix Global Resources
Argentina

|

2025

Condições de Trabalho

Temperature: 20 °C / 68°F | Pressure: 12 kg/cm² | Fluid components: Fresh water

Solução Pexgol

Pexgol 110 mm, Class 24

Aplicação

Fresh water transport

Comprimento

1260 m / 4133 ft

Categorias

Fresh Water Line Optimization in an Oil Field in Argentina

The Challenge

Phoenix Global Resources, an independent company focused on hydrocarbon exploration and production in Argentina, required the implementation of a new pipeline to transport fresh water from an intake point to its Central Processing Facility (CPF).

The main challenge of the project was not only the fluid conveyance itself, but also the execution conditions: it was essential to minimize installation time, optimize operational costs, and significantly reduce the number of joints along the pipeline route.

In this context, traditional solutions implied longer installation times, a greater need for fittings, and an increase in potential failure points. Additionally, the operation required a reliable solution capable of working at a pressure of 12 kg/cm² with a constant flow rate, ensuring continuity in the water supply for production processes.

The Solution

For this project, a 110 mm (Class 24) Pexgol pipe was implemented, with a total length of 1,260 meters, designed for fresh water transport under demanding operating conditions.

The selection of Pexgol made it possible to drastically reduce the number of joints thanks to its supply in long continuous lengths, improving system reliability and reducing installation time.

Project execution was completed in just 3 days, including trench installation, jointing through electrofusion and mechanical connections, and the final hydrostatic test.

A key aspect was the technical support provided during installation, as the contractor had no prior experience handling Pexgol pipes. This support ensured proper execution and maximized the system’s benefits from the outset.

Thanks to its flexibility, low weight, and ease of handling, the Pexgol solution enabled a fast, safe, and efficient installation, meeting the client’s objectives in terms of time, costs, and operational reliability.

Estudos de Caso Relacionados

Record-time intervention that avoided operational losses in a dehydration plant.

Critical Pipeline Replacement in Dehydration Plant with Operational Continuity

Petróleos Sudamericanos
Argentina

 | 

2025
Reduction of material build-up in brine and brine/acid lines

Mineral Processing – Brine Transportation

SQM,Pedro Valvidia Mine
Chile

 | 

2010
The impact of Pexgol piping on pump performance improvement and maintenance cost reduction at Sales de Jujuy.

Improvement in Brine Management through Pexgol Piping

Sales de Jujuy
Argentina

 | 

2023
Installation of 3000 Meters Of PE-X Pipe for an Underground Mine.

Drainage Lines in Underground Mine

Lundin Mining – Candelaria Norte Mine
Chile

 | 

2020
The innovative solution from Pexgol for Anglo American Peru’s piping challenges.

Navigating extreme conditions with Pexgol’s PE-X pipes

Anglo American Perú
Peru

 | 

2023
Guaranteeing an efficient water supply with the Pexgol piping solution in the Mendoza-San Juan Highway project.

Streamlining Water Supply in Highway Construction

Chediack / Ceosa
Argentina

 | 

2023