Streamlining Water Supply in Highway Construction

Guaranteeing an efficient water supply with the Pexgol piping solution in the Mendoza-San Juan Highway project.

Estudo de Caso Nº

135

Cliente

Chediack / Ceosa
Argentina

|

2023

Condições de Trabalho

Solução Pexgol

Pexgol 160 mm, Class 15

Aplicação

Water network

Comprimento

188 m / 616 ft

Categorias

Streamlining Water Supply in Highway Construction

The Challenge

The construction companies Chediack and Ceosa are undertaking a significant project in Argentina – building a dual-track highway that connects Mendoza to San Juan. As they embarked on the construction of the second section, they faced a specific challenge. They had to provide water to the cooperative responsible for the water distribution in that sector while constructing the highway. This required running a pipeline underneath the highway. The existing pipeline system, made of rubber and PVC, presented an interference under the embankment of the highway.

Furthermore, the challenge was compounded by the need to use a material that allowed for a continuous pipeline without dependencies on joints, given the considerable length of 188 meters (about 616 feet).

Pexgol Solution

Pexgol offered an apt solution to Chediack and Ceosa’s unique challenge with their 160mm PE-X pipe. Pexgol’s pipeline, owing to its ability to be shipped in long coils, allowed for a full-length installation without the need for joints. This attribute turned out to be particularly beneficial given the significant length required for this project.
Loose flanges and MAS joints were used in the installation process, which was quick and efficient. Once the trenching was completed, the Pexgol pipe was transported to the site, unrolled, lowered, and distributed into the trench. The trench was then backfilled with the excavated soil, compacted, and the remaining cover and compaction completed. The consortium responsible handled the connections to
the existing network and subsequent commissioning.

Opting for Pexgol’s pipeline system provided a multitude of benefits. Its quick installation time, lightweight and easy-to-handle properties, ability to provide long sections, and transportation in rolls helped streamline the water supply infrastructure in the highway construction project. The practicality and efficiency of Pexgol’s pipeline solution made it a valuable resource in the construction of the highway between Mendoza and San Juan.

Estudos de Caso Relacionados

In an engineering challenge, the Pexgol 225 mm (8”) Class 15 pipe proved to be the perfect solution for transporting tailings at the Mina Capela mining complex.

Environmental Protection and Efficiency in Tailings Management

Mina Capella - Grupo Peñoles
Mexico

 | 

2023
Water Drainage in Harsh Ground

Water Drainage at an Open-Cast Mine

Timmins Gold Corp Group, Molimentales del Noroeste Mine
Mexico

 | 

2016
Acid liquor line with high levels of abrasion and sedimentation

Abrasive Liquid Transportation

Moa Nickel S.A. Sherritt
Cuba

 | 

2014
Transport Of Palm Oil Slurry At 95°C.

Transport of Palm Oil Slurry

Loma Fresca
Colombia

 | 

2017
Dewatering tThrough Shafts for an Underground Lead-Zinc Mine.

Dewatering Through Shafts

Esan Eczacibasi Endustriyel Hammaddeler
Turkey

 | 

2019
Extraction of underground water through wells

Extraction of Underground Water

Doña Inés de Collahuasi SCM, Collahuasi Mine
Chile

 | 

2010