Abrasive Liquid Transportation

Acid liquor line with high levels of abrasion and sedimentation

Estudo de Caso Nº

21

Cliente

Moa Nickel S.A. Sherritt
Cuba

|

2014

Condições de Trabalho

70°C – 3 Bars.

Solução Pexgol

Pexgol 355 mm & Pexgol 315 mm, Class 12.

Aplicação

Acid liquor transportation with nickel, iron, cobalt and NaOH particles.

Comprimento

150 m.

Categorias

Acid liquor line with high levels of abrasion and sedimentation

The Challenge

Moa Nickel used rubber lined steel pipes to transport acid liquor.

Between 3 and 6 months they required to stop the plant for more than 24 hours, due to sedimentation issues that the steel pipe presented, reducing it inside diameter 60% less.

Furthermore, the steel pipe suffered leaks due to lined releases. Since the first moment that the liquid touched the steel, in a matter of minutes it was causing a leak.

Pexgol Solution

Golan provided Pexgol pipes of 355 mm and 315 mm with mechanical joints, and it only required to stop the plant one year after of the installation.

During that time, and due to the high sedimentation levels, the inside diameter was reduced just 30% less. The repair lasted only 4 hours, and it was done by hammer blows, in order to remove the material that

was obstructing the pipe. At the end, the pipe was functioning without problems.

Pexgol, it not only achieved to raise the production, but also the maintenance expenses were reduced. For every hour that the plant stopped, it cost hundreds of dollars to the company.

Estudos de Caso Relacionados

Replacing steel pipes suffering from sediment formation

Transportation of Ore Slurry

RUSAL, aluminum factory
Russia

 | 

2012

Categories:

Replacement of a HDPE Pipe for a Pexgol Pipe

Compressed Air Transportation

Saucito S.A. de C.V. Mine
Mexico

 | 

2017
Extraction of underground water through wells

Extraction of Underground Water

Doña Inés de Collahuasi SCM, Collahuasi Mine
Chile

 | 

2010
Installation of 1000 Meters of PE-X Pipe for an Underground Mine.

Mining Drainage Lines

Lundin Mining – Alcaparosa Mine
Chile

 | 

2019
Substitution of a Steel Spool for PE-X Coated for Pumping Formation Water.

Replacement of a Steel Spool with Pexgol

Enap Sipetrol
Ecuador

 | 

2021
Vertical Mobile Pexgol Installation on the Rocks for Mine Dewatering.

Mine Dewatering at Low Temperature

Ferrexpo Yeristovo Mining
Ukraine

 | 

2019