Fiber Optic Cables Through a Vertical Shaft

Installation of Pexgol Pipe to Transport Fiber Optic Cables.

Estudo de Caso Nº

99

Cliente

Sinohydro
Israel

|

2021

Condições de Trabalho

500 meters hanging without supports inside service shaft

Solução Pexgol

Pexgol 50 mm (2”) Class 15 | Pexgol 63 mm (2”) Class 15

Aplicação

Fiber Optic Cables Transport

Comprimento

Pexgol 50 mm: 14,050 m / 46,095 ft | Pexgol 63 mm: 9,100 m / 29,855 ft

Categorias

Installation of Pexgol Pipe to Transport Fiber Optic Cables.

The Challenge

Sinohydro, a Chinese state-owned hydropower engineering and construction company, wanted to install fiber optic cables through a vertical shaft 500 meters deep. They needed conduit pipes that would withstand the tensile forces of the pipe weight. The pipes have to be embedded in concrete, so they have to resist the temperature of the concrete during casting.

Pexgol Solution

Pexgol was chosen due to their ability to withstand high tensile forces and high temperatures.The 63 mm pipe was provided in 13 coils of 700 m each and the 50 mm pipe was provided in 13 coils of 1080 m each.
Only a double mechanical connector was used to hold the pipes above the pit.

Estudos de Caso Relacionados

Pexgol helped Profertil to overcome the corrosion challenge in its fire protection network.

From carbon steel to Pexgol: A victory against corrosion

Profertil
Argentina

 | 

2021
Greater operational efficiency with fewer joints and fast implementation.

Fresh Water Line Optimization in an Oil Field in Argentina

Phoenix Global Resources
Argentina

 | 

2025
Field evaluation of Pexgol PE-Xa pipes under highly abrasive iron ore slurry conditions at Cauê Mine.

Test Case – Field Performance Evaluation of Pexgol

Vale
Brazil

 | 

2025
Pexgol Pipe Installation for the Transport of Cyanide Water.

Transport of Cyanide Water

Equinox Gold
Mexico

 | 

2022
Streamlining Mine Dewatering and Water Transportation with Pexgol Pipes at Cerro Negro Mine.

Overcoming Installation Hurdles and Enhancing Operational Efficiency

Newmont
Argentina

 | 

2022
Pipe installation on a mountain

Meltdown Water Transport

Codelco Andina, TADA 1-2 Project
Chile

 | 

2013