Fiber Optic Cables Through a Vertical Shaft

Installation of Pexgol Pipe to Transport Fiber Optic Cables.

Estudo de Caso Nº

99

Cliente

Sinohydro
Israel

|

2021

Condições de Trabalho

500 meters hanging without supports inside service shaft

Solução Pexgol

Pexgol 50 mm (2”) Class 15 | Pexgol 63 mm (2”) Class 15

Aplicação

Fiber Optic Cables Transport

Comprimento

Pexgol 50 mm: 14,050 m / 46,095 ft | Pexgol 63 mm: 9,100 m / 29,855 ft

Categorias

Installation of Pexgol Pipe to Transport Fiber Optic Cables.

The Challenge

Sinohydro, a Chinese state-owned hydropower engineering and construction company, wanted to install fiber optic cables through a vertical shaft 500 meters deep. They needed conduit pipes that would withstand the tensile forces of the pipe weight. The pipes have to be embedded in concrete, so they have to resist the temperature of the concrete during casting.

Pexgol Solution

Pexgol was chosen due to their ability to withstand high tensile forces and high temperatures.The 63 mm pipe was provided in 13 coils of 700 m each and the 50 mm pipe was provided in 13 coils of 1080 m each.
Only a double mechanical connector was used to hold the pipes above the pit.

Estudos de Caso Relacionados

The mine was facing scaling issues with their existing HDPE pipes, which required replacement every two weeks. The introduction of Pexgol pipes drastically reduced scaling.

Pexgol: Significant Pipe Wall Scale Reduction

Copper Mine
USA

 | 

2022
Installation Oof Pexgol Pipes through a Chimney for Compressed Air.

Transport of Compressed Air for Underground Mine

HMC Gold
Chile

 | 

2021
Enhanced hydraulic and structural reliability for critical community infrastructure.

Optimization of Potable Water Supply for 1,600 residents

Rincón de la Candelaria
Mexico

 | 

2025
Replacing Steel for PE-X Pipes to Transported Processed Water.

Replacement of Steel Pipes for PE-X

Rosebel Gold Mines – IamGold
Suriname

 | 

2020
Replacement of a HDPE Pipe for a Pexgol Pipe

Slurry Transportation

Sabinas Mine
Mexico

 | 

2017
Transport of Formation Water with Hydrocarbons.

Formation Water Transport

ROCH
Argentina

 | 

2015