Skip to content

Vertical Drain in Underground Mine

Installation of Pexgol Pipes for Drainage of an Underground Mine

Estudo de Caso Nº

67

Cliente

Meridian Mine – Faena El Peñón
Chile

|

2018

Condições de Trabalho

Underground work

Solução Pexgol

Pexgol 160 mm (6”), Class 15 | Pexgol 160 mm (6”), Class 19 | Pexgol 200 mm (8”), Class 26.7

Aplicação

Mine Dewatering

Comprimento

800 m

Categorias

Installation of Pexgol Pipes for Drainage of an Underground Mine

The Challenge

The Meridian mine (Faena El Peñón) required the installation of a line for the drainage of high-pressure water from the lower level of the mine, passing through the vertical ventilation chimney with a height of 150 meters, continuing through the interior of the mine until an outdoor pool.

Pexgol Solution

The client decided to install 800 m of Pexgol pipes in three di erent sizes:
Pexgol 160 mm (6”) Class 15, 160 mm (6”) Class 19 and 200 mm (8”) Class 26.7.
The installation was very simple:

  • Lifting was carried out in the ventilation chimney.
  • Mechanical connections were used that did not require special tools for installation.
  • In the upper area the pipes were placed on supports provided by the mining company.

Pexgol was selected due to its capabilities:

  • Possibility of supply in long lengths minimizing the connections to only 4.
  • Ability to withstand the drag of more than 5 km from outside to the final assembly point inside the underground mine.
  • Ability to withstand creep involved in vertical mounting of 150 meters.

Estudos de Caso Relacionados

Dalvian SA Implements Pexgol for Potable Water Pipeline in the Mountains.

Innovative Solution for Water Supply in Extreme Terrain

Dalvian
Argentina

 | 

2024
Replacement of HDPE Pipes For Pe-X to Transport Industrial Treated Water.

Industrial Waste Water to MBR Treatment Facility

Chip Manufacturer
Israel

 | 

2021
Pexgol and Fresnillo: Allies in innovative piping solutions for mining.

Safety and durability: The heart of our solutions

Minera Fresnillo
Mexico

 | 

2021
Overcoming Corrosion Challenges in the Oil Industry

Overcoming Corrosion Challenges in the Oil Industry

Petróleos Sudamericanos
Argentina

 | 

2023
Replacement of a HDPE Pipe for a Pexgol Pipe

Compressed Air Transportation

Saucito S.A. de C.V. Mine
Mexico

 | 

2017
Bridging the Gap between Durability and Functionality in Harsh Processing Environments.

Syncrude & Pexgol: A Collaboration Set to Reshape Slurry Transport

Syncrude
Canada

 | 

2022