Transport of Cyanide Water

Pexgol Pipe Installation for the Transport of Cyanide Water.

Estudo de Caso Nº

112

Cliente

Equinox Gold
Mexico

|

2022

Condições de Trabalho

Fluid: Neutralized Solution pH 10-12 – cyanide water | Flow: 1000m3/hr | Suction level: 1352 m3/hr | Discharge level: 1431/1432 m3/hr

Solução Pexgol

Pexgol 400 mm (16”), class 10 & 15

Aplicação

Transport of cyanide water

Comprimento

1475 m / 4839 ft

Categorias

Pexgol Pipe Installation for the Transport of Cyanide Water.

The Challenge

Equinox Gold, a Canadian mining company dedicated to gold extraction in different countries, required for its “Los Filos” mining unit to pump from the ADR plant a neutralized solution (cyaninated water) for evaporation through sprinklers. Previously, steel and HDPE pipes were used for this type of application.

The steel suffered from corrosion problems and the HDPE from crystallization, which generated problems in the thermofusions.

Pexgol Solution

It was decided to use Pexgol in sections of 12 meters with electrofusion connections. This way, possible corrosion problems were avoided and the costs of the project were reduced.

The installation was carried out by the same personnel working at the mine with training from the Pexgol technical team.

Estudos de Caso Relacionados

Pan American Energy implements an efficient and sustainable solution for brine transportation.

Fast and Safe Brine Transport in the Salar de Hombre Muerto

Lithos (PAE)
Argentina

 | 

2024
An Outdoor Hydrant and Indoor Sprinklers were installed at Guyana Airport

Water Supply & Fire Extinguisher Line

Cheddi Jagan International Airport
Guyana

 | 

2018
Improving the efficiency of salmon farming with the superior solution of Pexgol pipes.

Pexgol’s Pipe Solution Enhances Salmon Farming

Mowi
Chile

 | 

2021
Transport of Leached Mud from the Treatment Plant to an Oxidation Lagoon

Palm Oil: Transport of Leached Mud

Industria Chiquibul
Guatemala

 | 

2018
Installation of a Borehole with Pipe in Sections for Reduced Space.

Installation of Water Well in Reduced Space

Mekorot
Israel

 | 

2020
Drainage in Underground Mine with Slopes Between 40° and 90°.

Water Drainage in Underground Mine

NEMISA Mine
Mexico

 | 

2018