Replacement of Carbon Steel Pipes by Pexgol for Fire Fighting Network.

Estudo de Caso Nº

117

Cliente

Profertil
Argentina

|

2022

Condições de Trabalho

Pressure: 15 bars | Temperature: Ambient

Solução Pexgol

Pexgol 180 (6″), 225 (8″) & 280 (12″) mm, Class 15

Aplicação

Water transport for fire network

Comprimento

1000 m / 3280 ft

Categorias

Replacement of Carbon Steel Pipes by Pexgol for Fire Fighting Network.

The Challenge

Profertil, an Argentine company specializing in the manufacture of fertilizers, has a fire network that is more than 10 years old working with carbon steel pipes.

Given that the water they transport has a high chloride content, the lines were affected by corrosion and in many cases even with scale that obstructed the pipe by 50%.

Pexgol Solution

In order to have an efficient fire-fighting network, the Profertil project team opted for a plastic pipe that does not suffer from corrosion, with less possibility of incrustations and its installation does not require specialized machinery.

Likewise, given bad experiences with other types of pipes in relation to installation and operation, the maintenance team carried out pressure tests and resistance to external damage with a sample that was delivered to them.

Finally, 3 lines with Pexgol pipes were installed and it is scheduled in other stages to completely replace the fire network, a total estimate of 7 km.

Electrofusion joints and accessories were used to carry out the derivations and changes of direction.
In relation to other materials and considering that in several places where the pipe had to be buried, obstacles were found from cables and other pipes, the installation was successful.

Estudos de Caso Relacionados

Reduction of material build-up in brine and brine/acid lines

Mineral Processing – Brine Transportation

SQM,Pedro Valvidia Mine
Chile

 | 

2010
Installation of a Drainage System between Dams in a Copper Mine.

Water Transport Between Dams

CODELCO – El Teniente Mine
Chile

 | 

2019
Trial Demonstrates Superior Wear Resistance in Sea Water + Ash Slurry Conditions.

Unmatched Durability in Harsh Slurry: Pexgol Outperforms Steel

Tata Power
India

 | 

2023
Delivering Durability and Flexibility for a Sustainable Approach to Space Access.

Pioneering Space Launches with Ground-breaking Piping Solutions

SpinLaunch
USA

 | 

2021
Water transportation with sulfide and cobalt particles

Water and Sulfide Transportation

Moa Nickel S.A. Sherritt
Cuba

 | 

2015
Improving drainage in the Media Luna mine with Pexgol.

Overcoming Geotechnical Challenges with Pexgol at Media Luna

Minera Media Luna
Mexico

 | 

2023