Success in Agricultural Desalination: Water Supply Challenges

Pexgol technology can overcome challenges in shallow well applications, offering an efficient and cost-effective solution for leading companies in the agricultural industry.

Estudo de Caso Nº

123

Cliente

BerryMex
Mexico

|

2019

Condições de Trabalho

Temperature: 21°C / 69°F | Pump pressure: 163 PSI y 540 m^3/hr.

Solução Pexgol

Pexgol 250 mm (10″), SDR 11

Aplicação

Borehole

Comprimento

243 m / 797 ft

Categorias

Success in Agricultural Desalination: Water Supply Challenges

The Challenge

BerryMex, a leader in the agricultural industry and recognized for its high-quality production of strawberries, raspberries, blueberries, and blackberries, faced a significant challenge at its desalination plant in Mexico. The company needed an efficient and cost-effective solution to transport seawater from shallow wells to its treatment and desalination plant.

The shallow wells drilled next to the sea had to be constructed with corrosionresistant pipes, capable of withstanding the weight of the water column and the 1,250 kg INDAR submersible pump. Initially, BerryMex considered using plastic pipes like PVC or CPVC, but these would not withstand the weight, risking the loss of the pump. The other options, stainless steel or superduplex pipes, were too costly in terms of materials and installation.

Pexgol Solution

Pexgol introduced its innovative crosslinked polyethylene (PE-X) pipe as a corrosionresistant solution with the capacity to withstand the required weight. In addition, the low roughness factor of Pexgol pipes prevents scaling, which extends their lifespan and minimizes maintenance interruptions.

Since their installation, Pexgol pipes have shown exceptional performance in BerryMex’s four wells, with no issues or decrease in water supply to the desalination plant. The installation time in each well did not exceed 4 hours, demonstrating the efficiency of the process.

The BerryMex team was able to easily assemble the Pexgol pipes at the construction site, using electrofusion couplings and load clamps on a steel base plate. With only two joints required per well, the Pexgol pipe system proved to be a cost-effective and durable solution.

Estudos de Caso Relacionados

Transportation of water in more than 150 mining crossroads

Water Transport on Crossroads

Doña Inés de Collahuasi SCM, Collahuasi Mine
Chile

 | 

2012
Transportation of water with solids from an open cast mine

Open Cast Mine Dewatering

Doña Inés de Collahuasi SCM, Collahuasi Mine
Chile

 | 

2013
How Pexgol Accelerated the Supply and Installation of a Critical Line.

Comprehensive Water Transportation Solution for Urgent Projects

Madagascar Mining
Madagascar

 | 

2024
Trial Demonstrates Superior Wear Resistance in Sea Water + Ash Slurry Conditions.

Unmatched Durability in Harsh Slurry: Pexgol Outperforms Steel

Tata Power
India

 | 

2023
Substitution of a Steel Spool for PE-X Coated for Pumping Formation Water.

Replacement of a Steel Spool with Pexgol

Enap Sipetrol
Ecuador

 | 

2021
Transport Of Palm Oil Slurry At 95°C.

Transport of Palm Oil Slurry

Loma Fresca
Colombia

 | 

2017