Success in Agricultural Desalination: Water Supply Challenges

Pexgol technology can overcome challenges in shallow well applications, offering an efficient and cost-effective solution for leading companies in the agricultural industry.

Estudo de Caso Nº

123

Cliente

BerryMex
Mexico

|

2019

Condições de Trabalho

Temperature: 21°C / 69°F | Pump pressure: 163 PSI y 540 m^3/hr.

Solução Pexgol

Pexgol 250 mm (10″), SDR 11

Aplicação

Borehole

Comprimento

243 m / 797 ft

Categorias

Success in Agricultural Desalination: Water Supply Challenges

The Challenge

BerryMex, a leader in the agricultural industry and recognized for its high-quality production of strawberries, raspberries, blueberries, and blackberries, faced a significant challenge at its desalination plant in Mexico. The company needed an efficient and cost-effective solution to transport seawater from shallow wells to its treatment and desalination plant.

The shallow wells drilled next to the sea had to be constructed with corrosionresistant pipes, capable of withstanding the weight of the water column and the 1,250 kg INDAR submersible pump. Initially, BerryMex considered using plastic pipes like PVC or CPVC, but these would not withstand the weight, risking the loss of the pump. The other options, stainless steel or superduplex pipes, were too costly in terms of materials and installation.

Pexgol Solution

Pexgol introduced its innovative crosslinked polyethylene (PE-X) pipe as a corrosionresistant solution with the capacity to withstand the required weight. In addition, the low roughness factor of Pexgol pipes prevents scaling, which extends their lifespan and minimizes maintenance interruptions.

Since their installation, Pexgol pipes have shown exceptional performance in BerryMex’s four wells, with no issues or decrease in water supply to the desalination plant. The installation time in each well did not exceed 4 hours, demonstrating the efficiency of the process.

The BerryMex team was able to easily assemble the Pexgol pipes at the construction site, using electrofusion couplings and load clamps on a steel base plate. With only two joints required per well, the Pexgol pipe system proved to be a cost-effective and durable solution.

Estudos de Caso Relacionados

Pan American Energy implements an efficient and sustainable solution for brine transportation.

Fast and Safe Brine Transport in the Salar de Hombre Muerto

Lithos (PAE)
Argentina

 | 

2024
Replacement of a Drainage Line in an Underground Mine.

Drainage in Underground Mine

Atacama Kozan
Chile

 | 

2019
Hot Caustic Line Replacement in Paper Mill

Pulp & Paper Mill

Svetlogorskiy Mill
Russia

 | 

2015
Replacement of Carbon Steel Pipes by Pexgol for Fire Fighting Network.

Water Transport for Fire Network

Profertil
Argentina

 | 

2022
Guaranteeing an efficient water supply with the Pexgol piping solution in the Mendoza-San Juan Highway project.

Streamlining Water Supply in Highway Construction

Chediack / Ceosa
Argentina

 | 

2023
Installation Of Pexgol Hanging Pipes In Underground Mine

Underground Mine Dewatering

Codelco Chuquicamata
Chile

 | 

2017