Transport of Muddy Water for Palm Oil Extractor

Pexgol pipe was selected for the assembly of a muddy water transport line for a palm oil processing company.

Estudo de Caso Nº

121

Cliente

Extractora Poligrow
Colombia

|

2022

Condições de Trabalho

Flow rate: 176 PSI | Temperature: 80°C / 176°F

Solução Pexgol

Pexgol 110 mm (4″), Class 15

Aplicação

Transport of Muddy Water

Comprimento

550 m / 1084 ft

Categorias

Transport of Muddy Water for Palm Oil Extractor

The Challenge

Poligrow Colombia is a company dedicated to the development of agro-industrial projects, focused on palm oil extraction.

Poligrow needed a new transport line for muddy water to the oxidation lagoons. For this purpose, excavation and installation of the piping was carried out in the palm crop, without causing damage to the plants or irrigation piping. The route of the piping extended from Florentino, passing through the main road and the plantation

Pexgol Solution

Poligrow opted to use Pexgol’s PE-X piping for the transport of muddy water. The choice of Pexgol was crucial to finish the project quickly and efficiently.

Pexgol was chosen for several reasons: firstly, the installation was quick and simple, which saved time and costs. Additionally, the use of PE-X piping reduced the number of necessary joints, further simplifying the installation.

Another advantage was the supply in a 550-meter roll, which minimized the need for additional cuts and joints. The installation of the 550 meters of piping was carried out in a record time of 7 hours, thanks to the efficiency and simplicity of the process.

To carry out the installation, two GP mechanical joints were used, and support was provided by a CAT 312 backhoe, a Benitin vibrocompactor, and a ratchet. In addition, the technical team responsible for the installation consisted of one officer and one assistant.

In summary, the choice of Pexgol and its PE-X piping for the transport of muddy water in the palm oil processing plant was a wise decision, as it allowed the project to be completed quickly, efficiently, and with minimal interruptions.

Estudos de Caso Relacionados

Installation of Pexgol Pipes for a Compress Air System.

Compressed Air System

Rav-Gon Printing House
Israel

 | 

2020
Installation Oof Pexgol Pipes through a Chimney for Compressed Air.

Transport of Compressed Air for Underground Mine

HMC Gold
Chile

 | 

2021
The Original Design for a Wastewater Treatment Plant included Stainless Steel Pipes, but after discovering the Superior Capabilities of Pexgol Pipes, the Entire Facility was Switched Over.

New Wastewater Treatment Plant with Pexgol Pipes

Wastewater Treatment Plant
Israel

 | 

2022
EMESA Optimizes Formation Water Transportation in Mendoza.

Pexgol’s Solution in Secondary Recovery for EMESA

EMESA
Argentina

 | 

2023
Pexgol’s resistance to scaling and chemicals delivers consistent operation in open-pit mining.

Switch to Pexgol Reduces Downtime in Molybdenum Concentrate Transport

Buena Vista del Cobre
Mexico

 | 

2024
Pexgol helped Profertil to overcome the corrosion challenge in its fire protection network.

From carbon steel to Pexgol: A victory against corrosion

Profertil
Argentina

 | 

2021