Transition to Corrosion-Free Diesel Delivery Systems

Pexgol’s Role in Enhancing Guaymas Protein’s Operations.

Estudo de Caso Nº

155

Cliente

Guaymas Protein
Mexico

|

2023

Condições de Trabalho

Temperature: 30°C / 86°F | Pressure: 5kg

Solução Pexgol

Pexgol 80 mm (3″), SDR 11

Aplicação

Diesel transport

Comprimento

100 m / 328 ft

Categorias

Transition to Corrosion-Free Diesel Delivery Systems

The Challenge

Guaymas Protein, a leader in fish-based protein products, faced significant issues with its existing carbon steel pipelines used for diesel transport. The prevalent saline environment in the area led to recurring corrosion of the pipes, resulting in frequent maintenance and replacements to prevent leaks and environmental contamination.

The Solution

By choosing Pexgol’s 3” RD 11 pipes, Guaymas Protein found an effective solution to its corrosion problems. Pexgol pipes, with their superior chemical and corrosion resistance, provided a durable alternative to carbon steel. The flanged coupling used in the installation facilitated a smooth transition, utilizing the existing supports on-site for a quick and simple setup. The lightweight and flexible nature of Pexgol pipes, along with their ability to be delivered in long lengths, significantly sped up the installation process and reduced the need for frequent maintenance, offering a sustainable and efficient system for diesel transportation.

Estudos de Caso Relacionados

Transport Of Palm Oil Slurry At 95°C.

Transport of Palm Oil Slurry

Loma Fresca
Colombia

 | 

2017
Installation of a New Pexgol Pipeline to Provide Hot Water for a Electro-Thermal Storage System.

Hot Water Distribution for Solar Technology

Raygen
Australia

 | 

2021
Transport of acid water at high temperatures

Water Transport with Low pH Level

Moa Nickel S.A. Sherritt
Cuba

 | 

2010
 How Pexgol streamlined water transportation at Zuccardi Winery

Fast and Reliable Solution for Winemaking Processes

Zuccardi Winery
Argentina

 | 

2024
Pexgol reduced the number of joints, accelerated installation, and improved network reliability.

2,900 Meters of Pexgol Installed and Pressure-Tested in Just 3 Days

Petróleos Sudamericanos
Argentina

 | 

2026
Replacement of HDPE Pipe for Pexgol

Slurry Transportation

Tizapa Mine
Mexico

 | 

2015