Condições de Trabalho
Extreme temperatures (-25° to 40°C).
Solução Pexgol
Pexgol 160 mm Class 19 (SDR 9).
Aplicação
Water extraction
Comprimento
400 m.
Categorias

The Challenge
The harsh environmental conditional where Codelco needed to install dewatering lines at the open cast mine, made the engineers opt for a change in their pipe material. They consider Pexgol as an option to decrease the repetitive failures they had with former materials.
Pexgol Solution
A 400 meters Pexgol pipe 160 mm Class 19 was provided, in one section without joints. The Pexgol pipe allowed a quick, reliable and easy installation on the harshest conditions of the open cast mine.
Estudos de Caso Relacionados
Overcoming Geotechnical Challenges with Pexgol at Media Luna
Minera Media Luna
Mexico
|
2023
Alumina Plant: Ore Slurry Transportation
Urals Alumina Plant – Rusal
Russia
|
2013
Transport of Muddy Water for Palm Oil Extractor
Extractora Poligrow
Colombia
|
2022
Vertical Drain in Underground Mine
Meridian Mine - Faena El Peñón
Chile
|
2018