Elevating Efficiency in Hydrocarbon Exploitation

Changing carbon steel for efficiency: Pexgol PE-X pipes in Aconcagua Energía

Estudo de Caso Nº

131

Cliente

Aconcagua Energía
Argentina

|

2023

Condições de Trabalho

Temperature: 35°C / 95°F | Flow: 80 m³/hour | Pressure: 10 Kg/cm²

Solução Pexgol

Pexgol 110 mm (4″), class 24

Aplicação

Formation water

Comprimento

1280 m / 4199 ft

Categorias

Changing carbon steel for efficiency: Pexgol PE-X pipes in Aconcagua Energía

The Challenge

As an independent energy company that vertically integrates all operations, Aconcagua Energía S.A. was seeking ways to enhance efficiency in its exploration and exploitation of conventional hydrocarbons. The primary challenge lay in the management of their formation water transportation line. An existing carbon steel pipe, used for this project, faced significant corrosion due to the transport of formation water, necessitating its removal from service. The project required a piping system that could withstand the corrosive environment, perform under operational conditions, and could be installed quickly and efficiently over a distance of approximately 1280 meters (or around 4199 feet).

Pexgol Solution

Pexgol was chosen as the ideal piping solution for Aconcagua Energía S.A. A Pexgol pipe of 110 mm diameter, class 24, renowned for its high resistance to chemicals and corrosion, was provided. Despite the project’s length and the piping system’s operational conditions—35°C (95°F) temperature, 80 m³/h flow rate, and 10 Kg/cm² pressure—Pexgol pipe’s durability and performance were unflinching.

One of the main benefits of Pexgol is its ease and speed of installation. The installation was completed in two days. Each morning, with the assistance of a backhoe, each roll was extended in less than an hour. The afternoons were spent burying the pipes at road crossings.
Another advantage of Pexgol pipes is the provision of long lengths that could be transported in rolls, minimizing the need for joints and reducing installation time.

Mechanical double connectors and GP flanged couplers were used in the installation, further ensuring a secure and leak-free system.
With Pexgol pipes, Aconcagua Energía S.A. successfully upgraded its formation water transportation system, reinforcing its commitment to efficiency and productivity. The client has also expressed a desire to replace their PRFV (Fiberglass Reinforced Plastic) pipe aqueducts with PEX, given the challenges they faced during the transportation and installation of PRFV. This successful transition attests to
Pexgol’s superiority and reliability as a piping solution in the energy sector.

Estudos de Caso Relacionados

EMESA Optimizes Formation Water Transportation in Mendoza.

Pexgol’s Solution in Secondary Recovery for EMESA

EMESA
Argentina

 | 

2023
Installation of a New Pexgol Pipeline to Provide Cold Water for a External Chiller System.

Cold Water Distribution for External Cooler System

Chip Manufacturer
Israel

 | 

2022
Installation of a Drainage System in an Open Pit Mine.

Drainage System

BHP Pampa Norte – Cerro Colorado Mine
Chile

 | 

2020
High Pressure Water Transport for a Gold Mine.

High Pressure Water Transport

Mansfield Mine
Argentina

 | 

2019
Transportation of water in more than 150 mining crossroads

Water Transport on Crossroads

Doña Inés de Collahuasi SCM, Collahuasi Mine
Chile

 | 

2012
Hot sylvinite leach at 114°C/237°F

Mineral Processing – Potash Processing Plant

ICL group, Dead Sea Works
Israel

 | 

1987