Skip to content

Hot Water Supply

Installation of Pexgol Pipes for Transporting Hot Water.

Estudo de Caso Nº

92

Cliente

Hilton
Israel

|

2020

Condições de Trabalho

Temperature: 70°C – 85°C | Pressure: 6 bar

Solução Pexgol

Pexgol 16 mm – 32 mm class 24

Aplicação

Hot Water Transportation

Comprimento

Categorias

Installation of Pexgol Pipes for Transporting Hot Water.

The Challenge

As one of the largest, and most well-known hotels, the “Hilton” hotel, located in central Israel, is obligated to supply hot water completely free of corrosion-residuals. While historically metal pipes were used for high-rise buildings, metal piping systems tend to cause severe corrosion accumulation. Corrosion build up could lead to damaged pipes and malfunctioning valves, connectors, pumps etc.

Pexgol Solution

The client decided to install Pexgol piping system to bring in a perfect non-corrosion-over-time solution. Pexgol cross-linked polyethylene can withstand high-temperature and high-pressure environments and provide a reliable and stable solution.

Estudos de Caso Relacionados

Transportation of Phosphoric acid in a potassium nitrate plant

Transportation of Phosphoric Acid

Haifa Chemicals
Israel

 | 

1995
Installation of a New Pexgol Pipeline to Provide Cold Water for a External Chiller System.

Cold Water Distribution for External Cooler System

Chip Manufacturer
Israel

 | 

2022
Food Transport Pexgol vs HDPE

Food Transport Pexgol vs HDPE

Marine Farms
Chile

 | 

2017
Pexgol extends pipe lifespan and reduces maintenance in salt production.

Fewer Shutdowns, Greater Efficiency: Pexgol in the Salt Industry

Sales del Istmo
Mexico

 | 

2023
Replacement of Carbon Steel Pipes by Pexgol Pipes for Tailing Lines.

Tailing Lines

Ambatovy
Madagascar

 | 

2017
Water line feed from wells to mine

Water Lines – High Pressure Water Feed Lines

Yamana Gold, Meridian Mine
Chile

 | 

2012