Mineral Processing Corrosive Liquid & Vapor

Transportation of mixed liquid and corrosive vapor (H2S) from the dehumidifiers

Estudo de Caso Nº

11

Cliente

Moa Nickel S.A. Sherritt
Cuba

|

2011

Condições de Trabalho

High corrosive liquid operating at 95°C/203°F.

Solução Pexgol

Pexgol 280 mm Class 10.

Aplicação

Dehumidifier water line.

Comprimento

800 meters.

Categorias

Mineral Processing Corrosive Liquid & Vapor

The Challenge

Cuba’s nickel reserves are among the largest in the world largest exports, making it essential to provide reliable and durable pipelines for the transportation of its minerals. Unfortunately, the high percentage of hydrogen sulfide in the hot water from the dehumidifiers over an extended period of time lends itself to high levels of corrosion and functional deterioration. Problems occurred from the beginning in previous installations, forcing work halts.

Before turning to Pexgol, our client tried an alternative piping solution without success: Carbon steel rubber lined (CSRL) – which proved to be damaged by weather conditions as well as suffer from extensive problems of corrosion around the welds due to lack of rubber. Such high levels of corrosion can also lead to a potential reduction of hydraulic capacity.

Pexgol Solution

A Pexgol 280 mm class 10 pipe with electrofusion couplers surrounded by steel reinforcements was installed, enabling durability under very high temperatures.

Several months since the installation of Pexgol, the system operates without any problems, it resulted more cost-effective per meter and had lower installation costs. As a result of the new installation, the line hydraulic capacity increased beyond the maximum expected values by the operations managers.

Estudos de Caso Relacionados

Guaranteeing an efficient water supply with the Pexgol piping solution in the Mendoza-San Juan Highway project.

Streamlining Water Supply in Highway Construction

Chediack / Ceosa
Argentina

 | 

2023
Installation of Pexgol Pipes in a Fish Processing Plant.

Fish Oil Transport at 36°C / 96.8°F

Guaymas Protein Company
Mexico

 | 

2018
Installation of 1000 Meters of PE-X Pipe for an Underground Mine.

Mining Drainage Lines

Lundin Mining – Alcaparosa Mine
Chile

 | 

2019
Replacement of a Drainage Line in an Underground Mine.

Drainage in Underground Mine

Atacama Kozan
Chile

 | 

2019
Water Transport from a Borehole with Low Ph.

Water transport in textile factory

CMT La Laguna
Mexico

 | 

2018
How Pexgol piping improved the fire network system infrastructure in a paint manufacturing plant.

Pexgol Piping for Fire Network System Expansion

Wall
Argentina

 | 

2023