Skip to content

Mineral Processing Corrosive Liquid & Vapor

Transportation of mixed liquid and corrosive vapor (H2S) from the dehumidifiers

Estudo de Caso Nº

11

Cliente

Moa Nickel S.A. Sherritt
Cuba

|

2011

Condições de Trabalho

High corrosive liquid operating at 95°C/203°F.

Solução Pexgol

Pexgol 280 mm Class 10.

Aplicação

Dehumidifier water line.

Comprimento

800 meters.

Categorias

Mineral Processing Corrosive Liquid & Vapor

The Challenge

Cuba’s nickel reserves are among the largest in the world largest exports, making it essential to provide reliable and durable pipelines for the transportation of its minerals. Unfortunately, the high percentage of hydrogen sulfide in the hot water from the dehumidifiers over an extended period of time lends itself to high levels of corrosion and functional deterioration. Problems occurred from the beginning in previous installations, forcing work halts.

Before turning to Pexgol, our client tried an alternative piping solution without success: Carbon steel rubber lined (CSRL) – which proved to be damaged by weather conditions as well as suffer from extensive problems of corrosion around the welds due to lack of rubber. Such high levels of corrosion can also lead to a potential reduction of hydraulic capacity.

Pexgol Solution

A Pexgol 280 mm class 10 pipe with electrofusion couplers surrounded by steel reinforcements was installed, enabling durability under very high temperatures.

Several months since the installation of Pexgol, the system operates without any problems, it resulted more cost-effective per meter and had lower installation costs. As a result of the new installation, the line hydraulic capacity increased beyond the maximum expected values by the operations managers.

Estudos de Caso Relacionados

Pexgol’s resistance to scaling and chemicals delivers consistent operation in open-pit mining.

Switch to Pexgol Reduces Downtime in Molybdenum Concentrate Transport

Buena Vista del Cobre
Mexico

 | 

2024
Enhancing Efficiency and Durability in the Construction of Aerial Pipelines.

Facing the Challenges of the Neuquén Terrain in Argentina

Pluspetrol
Argentina

 | 

2023
High Pressure potable water line

High Pressure Potable Water Line

Antofagasta Minerals, Pelambres Mine
Chile

 | 

2014
Installation of Pexgol Pipe for Transportation of Mining Tailings.

Tailings Transport with 50% solids

Golden Resource Corp. – Don David Gold Mine
Mexico

 | 

2019
Installation of a Drainage System between Dams in a Copper Mine.

Water Transport Between Dams

CODELCO – El Teniente Mine
Chile

 | 

2019
Transportation of brackish water to the main pumping station

Water Lines – Harsh Conditions

Dead Sea Works
Israel

 | 

1993