Skip to content

Water Extraction from Wells

Water Extraction From Deep Wells (150 Meters)

Estudo de Caso Nº

27

Cliente

Andacollo Mine
Chile

|

2015

Condições de Trabalho

Extreme environmental temperatures (-5°C to 38°C).

Solução Pexgol

Pexgol 110 mm, Class 24 (SDR 7.4).

Aplicação

Water extraction.

Comprimento

150 m.

Categorias

Water Extraction From Deep Wells (150 Meters)

The Challenge

At Andacollo Mine, the process water was extracted from deep wells through a steel galvanized pipe. This pipes suffered repetitive failures on the joints and required a considerable long installation time. The client requested a pipe that could last longer, in order to minimize the stops at the plant for maintaining purposes.

Pexgol Solution

Golan provided 150 meters of Pexgol pipe 110 mm Class 24 (SDR 7.4) in one section. The pipe, once it was installed, managed to hold the weight of the pump, the cables and the water column, with no efforts.

For the pump maintenance, usually it requires to be extracted from the well. Thanks to Pexgol, Andacollo Mine managed to save time and money, due to the capacity to extract the pipe when is full of water, and there’s no need to do any drain.

Moreover, usually for a steel pipe it would have required more than 25 screwed joints, but with Pexgol it only took 2 (one to the pump and another one to the wellhead).

Estudos de Caso Relacionados

Installation of Pexgol Pipesf for the Drainage of an Underground Mine.

High Pressure Drain in Underground Mine

Ojos del Salado Mine – Lundin Mining
Chile

 | 

2018
Installation of a Borehole with Pipe in Sections for Reduced Space.

Installation of Water Well in Reduced Space

Mekorot
Israel

 | 

2020
Substitution of a Steel Spool for PE-X Coated for Pumping Formation Water.

Replacement of a Steel Spool with Pexgol

Enap Sipetrol
Ecuador

 | 

2021
Water Extraction From A Middle Pool To The Exterior Of The Mine

Dewatering at an Open Cast Mine

Codelco, Ministro Hales Division
Chile

 | 

2016
Transport Of Palm Oil Slurry At 95°C.

Transport of Palm Oil Slurry

Loma Fresca
Colombia

 | 

2017
Transport of Muddy Water (Pome) witha High Content of Organic Load.

Transport of Muddy Water in a Palm Oil Processing Plant

La Gloria
Colombia

 | 

2020