Cliente

Andacollo Mine
Chile

|

2015

Condições de Trabalho

Extreme environmental temperatures (-5°C to 38°C).

Solução Pexgol

Pexgol 110 mm, Class 24 (SDR 7.4).

Aplicação

Water extraction.

Comprimento

150 m.

Categorias

Water Extraction From Deep Wells (150 Meters)

The Challenge

At Andacollo Mine, the process water was extracted from deep wells through a steel galvanized pipe. This pipes suffered repetitive failures on the joints and required a considerable long installation time. The client requested a pipe that could last longer, in order to minimize the stops at the plant for maintaining purposes.

Pexgol Solution

Golan provided 150 meters of Pexgol pipe 110 mm Class 24 (SDR 7.4) in one section. The pipe, once it was installed, managed to hold the weight of the pump, the cables and the water column, with no efforts.

For the pump maintenance, usually it requires to be extracted from the well. Thanks to Pexgol, Andacollo Mine managed to save time and money, due to the capacity to extract the pipe when is full of water, and there’s no need to do any drain.

Moreover, usually for a steel pipe it would have required more than 25 screwed joints, but with Pexgol it only took 2 (one to the pump and another one to the wellhead).

Estudos de Caso Relacionados

Transportation of brackish water to the main pumping station

Water Lines – Harsh Conditions

Dead Sea Works
Israel

 | 

1993
Transportation of water in more than 150 mining crossroads

Water Transport on Crossroads

Doña Inés de Collahuasi SCM, Collahuasi Mine
Chile

 | 

2012
Transport of high corrosive material from the thickeners to the neutralization plant

Corrosive Material Transportation

Moa Nickel S.A. Sherritt
Cuba

 | 

2015
Replacement of a HDPE Pipe for a Pexgol Pipe

Slurry Transportation

Sabinas Mine
Mexico

 | 

2017
Replacement of Carbon Steel Pipes with Pexgol for the Transportation of Natural Gas.

Natural Gas Transportation with Pexgol

YPF
Argentina

 | 

2022
Replacing Steel for PE-X Pipes to Transported Processed Water.

Replacement of Steel Pipes for PE-X

Rosebel Gold Mines – IamGold
Suriname

 | 

2020