Fast and Reliable Solution for Winemaking Processes

How Pexgol streamlined water transportation at Zuccardi Winery

Estudo de Caso Nº

172

Cliente

Zuccardi Winery
Argentina

|

2024

Condições de Trabalho

Temperature: Ambient | Flow rate: 150 L/min | Pressure: 2 bar | Fluid: Potable water

Solução Pexgol

Pexgol 90 mm, class 15

Aplicação

Potable water transport

Comprimento

120 m / 393 ft

Categorias

Fast and Reliable Solution for Winemaking Processes

The Challenge

Zuccardi Winery, internationally acclaimed for its innovation and quality in wine production, needed to implement a potable water transport line to supply both consumption and vinification processes. The challenge was to connect the storage tanks—located in a separate building—to the main plant through a system that ensured a fast, safe, and efficient installation. Additionally, the solution had to minimize leakage risks while optimizing installation time and costs.

The terrain conditions called for a reliable piping system that did not require a sand bed for burial and could be handled easily, considering operational and space constraints around the winery.

The Solution

Zuccardi selected 90 mm Pexgol class 15 pipes for the project. This decision was based on Pexgol’s key advantages, including:

  • Rapid Installation: The 120 meters of pipe were uncoiled and laid out in just 20 minutes.
  • Fewer Joints: Thanks to the long-length coil format, no joints were needed along the run, significantly reducing leakage risks and associated costs.
  • Easy Handling: The lightweight material enabled efficient transport and installation, even under limited operational conditions.
  • Strength and Adaptability: The pipe required no sand bed for burial, simplifying the installation process.

The final installation was carried out two days after trench preparation and took only 2 hours, including burial and backfilling. Both ends of the pipeline were connected using flanged couplings to ensure system integrity.

Estudos de Caso Relacionados

Groundwater Transportation With Ph Low Levels

Groundwater Transportation

Grupo México, Buena Vista del Cobre Mine
Mexico

 | 

2015
Replacing Steel for PE-X Pipes to Transported Processed Water.

Replacement of Steel Pipes for PE-X

Rosebel Gold Mines – IamGold
Suriname

 | 

2020
Adapting to the demands of the process: how Pexgol solves the problems of corrosion and abrasion in the extraction of palm oil.

Implementation of Pexgol Pipelines for the Transport of Muddy Water

IACSA
Colombia

 | 

2023
High Pressure Water Transport for a Gold Mine.

High Pressure Water Transport

Mansfield Mine
Argentina

 | 

2019
Transformation in the logistics of formation water.

Aconcagua Energía Implements Pexgol Solutions for Efficiency and Savings

Aconcagua Energía
Argentina

 | 

2023
Cement Slurry Injection to an Underground Mine

Backfill

Aguilar Mine
Argentina

 | 

2015