Leached Slurry Transportation

Slurry transportation with high nickel levels

Estudo de Caso Nº

18

Cliente

Moa Nickel S.A. Sherritt
Cuba

|

2013

Condições de Trabalho

Extreme transport temperature (110°C).

Solução Pexgol

Pexgol 500 mm, Class 15 & Pexgol 355 mm, Class 15.

Aplicação

Slurry transportation.

Comprimento

350 m.

Categorias

Slurry transportation with high nickel levels

The Challenge

Moa Nickel used to transport leached slurry from the tubular reactors to the CCD thickener feed line. This process caused several issues on different pipe materials. The transported fluid was composed by:

  • 28-32 g/l acid
  • 1,00 g/l N
  • 0,54 g/l Co
  • 1,00 g/l Fe
  • 21,00 g/l SO4
  • 30,0 g/l free acids
  • Solids: 0,086% Ni, 0,013% Co, 46,00% Fe

Previously, titanium Sch20 pipes were installed, but if suffered deformations and it needed to be repaired constantly. The titanium pipe was replaced for a stainless steel pipe 316 Sch40, and it lasted 8 years and it finally required to be replaced because it presented wear issues.

Pexgol Solution

Golan provided 11.8 meters of pipes sections with mechanical joins that could resist corrosion, high temperatures and wear with no effort.

Regarding the prices per meter, installation costs and maintenance, versus stainless steel and titanium pipes, Pexgol proved to be the most convenient option.

Estudos de Caso Relacionados

Installation of a Pexgol Pipe on top of a Steel Outdated Pipe

Carriage of Chemicals at Sea Port

Ashdod Sea Port
Israel

 | 

2016
Innovation and improvement in fluid transportation in the oil and gas industry.

Streamlining Effluent Treatment with Pexgol

Pan American Energy
Argentina

 | 

2023
Installation of a Pexgol Line for the Transport of Formation Water in an Oil Company.

Replacement of Metal Pipe with PE-X for Formation Water

Enap Sipetrol Ecuador
Ecuador

 | 

2022
Pexgol: Delivering Rapid, Reliable & Long-lasting Mining Drainage Solutions

Addressing Drainage Challenges with Pexgol

Avino Mine
Mexico

 | 

2023
Installation of Pexgol Pipe to Transport Brine at High Pressure in a Borehole.

Transporting Brine at High Pressure

Mekorot
Israel

 | 

2020
Installation of a New Pexgol Pipeline to Provide Hot Water for a Electro-Thermal Storage System.

Hot Water Distribution for Solar Technology

Raygen
Australia

 | 

2021