Skip to content

Efficient Implementation of NaOH Drainage Systems

Profertil and the Adaptation to New Chemical Processes with Pexgol.

Estudo de Caso Nº

161

Cliente

Pluspetrol
Argentina

|

2023

Condições de Trabalho

Temperature: Ambient | Pressure: Atmospheric | Flow Rate: 50 liters/hour | Fluid Components: 50% Sodium Hydroxide

Solução Pexgol

Pexgol 160 mm, class 15

Aplicação

Sodium Hydroxide Discharge

Comprimento

10 m / 32 ft

Categorias

Efficient Implementation of NaOH Drainage Systems

The Challenge

Profertil, a leading company in the production and commercialization of soil nutrients in Argentina, faced a significant challenge at its plant. With the recent modification of their processes to include the discharge of 50% sodium hydroxide (NaOH), it became imperative to develop suitable infrastructure to handle this highly corrosive chemical.

The original unloading system was not designed for NaOH, necessitating the creation of a completely new system capable of handling the unique specifications of this chemical.

The Solution

Profertil decided to implement a solution using a 10-meter Pexgol pipe, leveraging pipes that the company had already acquired for another project. Pexgol was chosen due to its high resistance to chemicals, durability against corrosion,
and ease of handling and installation. The project involved excavation and civil works necessary to install and connect the new piping to the collection chambers, followed by paving the surface to ensure the system’s integrity.

The installation of the Pexgol pipe was successfully completed, connecting the collection chambers in the truck unloading area. This system now efficiently handles the excess NaOH and wash water, combining and draining them without incidents. Since its commissioning four months ago, the infrastructure has operated without issues, demonstrating Pexgol’s ability to adapt to Profertil’s specific industrial chemical handling needs.

The client, Profertil, expressed satisfaction with the versatility and effectiveness of the solutions provided by Pexgol, highlighting the quick installation and reduced risks associated with handling corrosive substances.

Estudos de Caso Relacionados

Installation of a New Pexgol Pipeline to Provide Cold Water for a External Chiller System.

Cold Water Distribution for External Cooler System

Chip Manufacturer
Israel

 | 

2022
Dewatering With Low Ph Levels

Open Cast Mine Dewatering

Arcelor Mittal Mine
Mexico

 | 

2016
Securing the future of gold mining: Newmont Corporation chooses Pexgol for water transport

Newmont’s Water Transportation Revolution with Pexgol Pipes

Newmont Corporation
Argentina

 | 

2018
Improving the efficiency of salmon farming with the superior solution of Pexgol pipes.

Pexgol’s Pipe Solution Enhances Salmon Farming

Mowi
Chile

 | 

2021
Installation of a Pexgol Line 200 Meters Deep at an Underground Mine

Transport of Compressed Air

Meridian Mine – Faena El Peñón
Chile

 | 

2018
A Case Study on the Collaborative Engineering and Strategic Implementation of the Pexgol Pipeline System for Public Safety and Efficiency

Innovation in Safety: Pexgol Piping System for LPG Supply

Rawabi City
Israel

 | 

2010