Meltdown Water Transport
Pipe installation on a mountain
Estudo de Caso Nº
16
Cliente
Codelco Andina, TADA 1-2 Project
Chile
|
2013
Condições de Trabalho
Complex & harsh ground, 300 m altitude.
Solução Pexgol
Pexgol 315 mm, Class 15 (SDR 11).
Aplicação
Water transportation.
Comprimento
3,300 m.
Categorias

The Challenge
Codelco needed to transport meltdown water downhill at Andes Mountain range.
The water pipes installation was a big risk for the team, as well as huge workforce with short time schedules.
Pexgol Solution
Using hoses seemed to be the solution, but the complexity of its installation made the client decided to use Pexgol in long sections instead.
The installation was simplified by the use of Pexgol long sections.
The pipes were unrolled from it coils and jointed trough electro-fusion, to be dragged and mapped out according to the project.
The installation was done in perfect timing with an optimal performance.
Estudos de Caso Relacionados
Water Extraction from Wells
Andacollo Mine
Chile
|
2015
Dewatering Through Shafts
Esan Eczacibasi Endustriyel Hammaddeler
Turkey
|
2019
Recovered Water Transportation
Coeur Mexicana S.A. de C.V. Palmarejo
Mexico
|
2017
Pexgol for Centrifugal Pump Test
Flowserve
Argentina
|
2022
Efficient Implementation of NaOH Drainage Systems
Pluspetrol
Argentina
|
2023