Estudo de Caso Nº

150

Cliente

Peña Colorada
Mexico

|

2023

Condições de Trabalho

Temperature: Ambient Flow: 410 m^3/h | Pressure: 7 bar | Fluid components: Rainwater Pipe exposed to the sun

Solução Pexgol

Pexgol 10″, SDR 11

Aplicação

Mine Dewatering

Comprimento

500 m / 1640 ft

Categorias

Evolving Mine Operations with Pexgol Piping

The Challenge

Peña Colorada, a leading company dedicated to the exploration, exploitation, and beneficiation of iron ore, met with a unique operational hurdle at their open-pit mine in Mexico. Historically, they employed HDPE piping systems for mine drainage.

However, as the mine’s surface continuously evolved, they faced the challenge of constantly relocating their pumps and piping. Each relocation with their steel pipes required a significant workforce, two cranes, and a special transportation mechanism for the pipe. Furthermore, they had to ensure very broad curves to prevent leakage at the joints.

Pexgol Solution

Pexgol, recognizing the inherent challenges with the existing piping system, introduced their 10” SDR 11 pipes. These were designed not only to address the drainage needs but to offer unmatched flexibility in a mining environment where surfaces change frequently. The Pexgol pipes could be easily dragged for relocation across the mine’s floor without compromising operational pressures. Moreover, these pipes could effortlessly follow any path necessary for optimal drainage.

During installation, as the pipe was being unrolled, it was simultaneously positioned where it was to be installed, connecting the pump to the discharge pipe. The entire process was completed in a single shift without any special surface preparation. The mine, which notably produces steel and even manufactures steel pipes, chose Pexgol due to its superior corrosion resistance and installation flexibility.

Estudos de Caso Relacionados

Installation of a Pexgol Line 200 Meters Deep at an Underground Mine

Transport of Compressed Air

Meridian Mine – Faena El Peñón
Chile

 | 

2018
The Original Design for a Wastewater Treatment Plant included Stainless Steel Pipes, but after discovering the Superior Capabilities of Pexgol Pipes, the Entire Facility was Switched Over.

New Wastewater Treatment Plant with Pexgol Pipes

Wastewater Treatment Plant
Israel

 | 

2022
Installation of a Drainage System in an Open Pit Mine.

Drainage System

BHP Pampa Norte – Cerro Colorado Mine
Chile

 | 

2020
Replacement of Carbon Steel Pipes by Pexgol for Fire Fighting Network.

Water Transport for Fire Network

Profertil
Argentina

 | 

2022
Installation of Pexgol Pipe for Transportation of Mining Tailings.

Tailings Transport with 50% solids

Golden Resource Corp. – Don David Gold Mine
Mexico

 | 

2019
Química del Rey replaced a corroded steel column with a Pexgol line, achieving a faster, safer, and more durable installation.

Reliable Solution for Deep Wells in Corrosive Environments

Química del Rey
Mexico

 | 

2022