Skip to content

Evolving Mine Operations with Pexgol Piping

The Robust & Flexible Answer to Constantly Changing Mine Surfaces.

Estudo de Caso Nº

150

Cliente

Peña Colorada
Mexico

|

2023

Condições de Trabalho

Temperature: Ambient Flow: 410 m^3/h | Pressure: 7 bar | Fluid components: Rainwater Pipe exposed to the sun

Solução Pexgol

Pexgol 10″, SDR 11

Aplicação

Mine Dewatering

Comprimento

500 m / 1640 ft

Categorias

Evolving Mine Operations with Pexgol Piping

The Challenge

Peña Colorada, a leading company dedicated to the exploration, exploitation, and beneficiation of iron ore, met with a unique operational hurdle at their open-pit mine in Mexico. Historically, they employed HDPE piping systems for mine drainage.

However, as the mine’s surface continuously evolved, they faced the challenge of constantly relocating their pumps and piping. Each relocation with their steel pipes required a significant workforce, two cranes, and a special transportation mechanism for the pipe. Furthermore, they had to ensure very broad curves to prevent leakage at the joints.

Pexgol Solution

Pexgol, recognizing the inherent challenges with the existing piping system, introduced their 10” SDR 11 pipes. These were designed not only to address the drainage needs but to offer unmatched flexibility in a mining environment where surfaces change frequently. The Pexgol pipes could be easily dragged for relocation across the mine’s floor without compromising operational pressures. Moreover, these pipes could effortlessly follow any path necessary for optimal drainage.

During installation, as the pipe was being unrolled, it was simultaneously positioned where it was to be installed, connecting the pump to the discharge pipe. The entire process was completed in a single shift without any special surface preparation. The mine, which notably produces steel and even manufactures steel pipes, chose Pexgol due to its superior corrosion resistance and installation flexibility.

Estudos de Caso Relacionados

Transport of Leached Mud from the Treatment Plant to an Oxidation Lagoon

Palm Oil: Transport of Leached Mud

Industria Chiquibul
Guatemala

 | 

2018
Installation of Pexgol pipes for the transport of formation water (gas and minerals)

Gas Wells: Formation Water Treatment

Canacol
Colombia

 | 

2018
Water Transport from a Borehole with Low Ph.

Water transport in textile factory

CMT La Laguna
Mexico

 | 

2018
Transportation of water in more than 150 mining crossroads

Water Transport on Crossroads

Doña Inés de Collahuasi SCM, Collahuasi Mine
Chile

 | 

2012
Bridging the Gap between Durability and Functionality in Harsh Processing Environments.

Syncrude & Pexgol: A Collaboration Set to Reshape Slurry Transport

Syncrude
Canada

 | 

2022
A Two-Phase Installation for High-Temperature Hot Water Supply & Return.

Scaling Up Efficiency: District Energy at Penn State Harrisburg

Penn State University - Harrisburg
USA

 | 

2021